ERA Skyline Real Estate

Tuesday, December 27, 2016

4 Reasons to Buy Your Dream Home This Winter



Hello Friends,

As the temperature in many areas of the country starts to cool down, you might think that the housing market will do the same. This couldn’t be further from the truth! Here are 4 reasons you should consider buying your dream home this winter instead of waiting for spring!

1. Prices Will Continue to Rise
CoreLogic’s latest Home Price Index reports that home prices have appreciated by 6.3% over the last 12 months. The same report predicts that prices will continue to increase at a rate of 5.2% over the next year.
The bottom in home prices has come and gone. Home values will continue to appreciate for years. Waiting no longer makes sense.

2. Mortgage Interest Rates are Projected to Increase
Your monthly housing cost is as much related to the price you pay for your home as it is to the mortgage interest rate you secure.
Freddie Mac’s Primary Mortgage Market Survey shows that interest rates for a 30-year mortgage are currently at 4.08%. The Mortgage Bankers Association, Fannie Mae, Freddie Mac & the National Association of Realtors are in unison, projecting that rates will increase by this time next year.
An increase in rates will impact YOUR monthly mortgage payment. A year from now, your housing expense will increase if a mortgage is necessary to buy your next home.

3. Either Way You’re Paying a Mortgage
There are some renters who have not yet purchased a home because they are uncomfortable taking on the obligation of a mortgage. Everyone should realize that, unless you are living with your parents rent free, you are paying a mortgage - either yours or your landlord’s.
As an owner, your mortgage payment is a form of ‘forced savings’ that allows you to have equity in your home that you can tap into later in life. As a renter, you guarantee your landlord is the person with that equity.
Are you ready to put your housing cost to work for you?

4. It’s Time to Move on with Your Life
The ‘cost’ of a home is determined by two major components: the price of the home and the current mortgage rate. It appears that both are on the rise.
But what if they weren’t? Would you wait?
Look at the actual reason you are buying and decide whether it is worth waiting. Whether you want to have a great place for your children to grow up, you want your family to be safer or you just want to have control over renovations, maybe now is the time to buy.

If the right thing for you and your family is to purchase a home this year, buying sooner rather than later could lead to substantial savings. https://goo.gl/Wr1usU

Thanks so much,

ERA Skyline Real Estate
3376 Harrison Blvd.
Ogden, UT 84403
(801)627-6500

Tuesday, December 20, 2016

Remodeling Your Kitchen: The Schedule



Hello Friends,

As we review the typical schedule for a kitchen remodel, keep in mind you are attempting to execute something even more challenging. In a staged remodel, the likelihood and consequences of errors grow. If you make a misstep, such as demolishing your cabinets too early in the process, you could find yourself living with an unusable kitchen for years, rather than months.

Today we take you through scheduling the intricate production of your staged kitchen remodel.

Scheduling Basics

The longing to jump right in can be irresistible. That old, beat-up kitchen sits there in its dreary, dilapidated state, with odd colors, finishes and fixtures, silent save for the drip, drip, dripping of your old faucet — but just hold on. Tighten up that faucet and be patient.

Starting anything, and replacing anything, without the whole picture in mind is a rabbit-hole-like trap. Enter that dark hole, and you may find it hard to get back on track. Your purchases may not work in your finished scheme or may be damaged in the subsequent remodel steps, and work completed out of sequence may need to be redone at a later stage.

Avoid this common misstep by building your schedule first, then sticking to it. Use an Excel spreadsheet (or Word document if that’s easier for you).

Typical Schedule

Books have been written about construction scheduling, and there is no way to cover everything that might be considered here. But there are some typical remodel scheduling rules to follow. Some of these might differ job to job, and not all contractors agree entirely on the order, but here’s a good framework of order to consider:

o     Demo
o     Rough work (framing, plumbing, electrical)
o     Insulation (exterior walls, under floor and under roof)
o     Drywall
o     Prime and paint
o     Cabinet installation
o     Slab and tile
o     Floors
o     Finish work (finish carpentry, electrical, fixture installations, finish hardware)
o     Final paint

It’s not that simple, of course. Every job is different, and experienced professionals understand the necessity of looking at each job as its own operation. The remodel schedule above does not take into account exterior work, such as foundation, siding and roofing, which might be necessary for your project.

It also does not take into account window installations, doors and masonry work, which are only some of the tasks that might need to be included in your schedule.

The schedule must be created and reviewed carefully in association with the plan and the scope of work created in the first two parts of this series, confirming that each job requirement has been considered and accounted for.

We create our schedule on an Excel spreadsheet with target dates for start and completion related to each subcontractor and each task. We also note the dates fixtures, appliances and any other required selections need to be available on the job, as well as the date each respective selection needs to be finalized and then ordered to meet that requirement.

Demo Schedule

Relating this typical remodel schedule to staged work is a challenging proposition. Typically, the demo goes first, but what if this remodel is going to take place over a few years? You need to give extra thought to this step and possibly complete demo work in its own stages.

For instance, if your remodel involves expanding the size of your kitchen, you may be able to totally demolish the relevant exterior wall only after the foundation and framing stages are completed outside.

You will likely not want to demo all the interior cabinets initially if you are planning to rough-in (complete framing and roofing to waterproof condition) the new space in one step and then wait to save up for the subsequent step. If that’s the case, you should save everything you possibly can in your existing kitchen, leaving it usable for the wait between.

Take-away: If you have kept your staged remodel simple, you want to make sure not to execute demo until absolutely necessary. Don’t demo the floor until the new floor is ready to install. The same goes for cabinets, countertops and anything else you are planning to replace.
Email
Rough Work Schedule

For the purposes of this explanation, rough work includes all facets of the remodel that should be completed before the drywall stage. If you are trying to keep your remodel simple and trying to keep costs down, then minimizing the necessity for rough work is the place to start.

Adding space equals rough work, and revising locations of plumbing requires rough work. This also relates to relocated cabinets, lights and appliances.

Using existing layout and location is a big plus when we talk about the complexity of a kitchen remodel, and thus the cost of the remodel. Whatever rough work is required, your goal should be to complete as much of that work as possible while leaving the existing kitchen operational. This is not always the most efficient way to work, but in a staged remodel it has to be prioritized.

Take-away: Completing rough work to a dry-in state that ensures your home is properly waterproofed and protected from the elements can be a good break point in a staged remodel.


Painting Schedule

There is some debate about painting when it comes to the schedule. Some like to bring the painter in at the end of the job. The painter comes in once, tapes and protects finishes and executes the job.

We typically bring the painter on the job in at least two stages: first, to prime and paint walls and ceiling, and then, after flooring, to paint or stain wood trim and put a second finish coat on walls.

The size of your job may give you the answer on this. If the remodel is small and simple, it can make sense to skip the first painter step and bring your painter in at the end of the job.

Another consideration is the cabinet finish. If you are refinishing existing cabinets, your painter may be able to remove drawers and doors and refinish them in the shop, leaving your kitchen mostly usable in the process. In that case, the painter would only refinish the cabinet frames on the job.

Take-away: In a simple, more manageable staged remodel, it can make sense to complete the painting as a final step on the job.

Cabinet Schedule

You may be replacing cabinets, you may be refinishing them or you may be letting them be. In a staged remodel, the key is to make that determination early. If some cabinet demo is necessary, don’t demo cabinets until the new ones are ready to install.

It’s advisable to have a cabinet plan with designs completed before the start of your job. For custom cabinets it can take six weeks or more from the time cabinets are ordered before they are ready to install. You need to build this time into your schedule so you are not stuck with unexpected delays, minimizing the time you have to live in a nonoperational kitchen.

Cabinet measure, in which the cabinetmaker measures the existing space the cabinets will fill, typically cannot be completed until all rough work is completed. The reason for this is that cabinets need to precisely fit their spaces and accommodate architectural features, and cabinetmakers know finished spaces do not always end up precisely matching the original plan dimensions.

Take-away: In a staged remodel, refinishing existing cabinets, possibly replacing cabinet doors and drawers, is the most cost-effective way to improve the look of a kitchen, and it can be executed as a rather painless phase of a staged job over time.

Tile and Slab Schedule

The biggest scheduling conflicts with tile and slab usually involve material delays. You can help avoid this by finalizing your design early in the process, with full selections for backsplash, slab and, if required, flooring. These selections, in coordination with accurate designs and timely deposit payments, go a long way toward avoiding delays in this category.

Some tiles are readily available at big box or other hardware stores, while other custom tiles may require months of lead time to manufacture. This is not something you want to leave to the last minute, as a likely one-week tile install could take months if the installer is waiting on material.

Take-away: Tile and slab replacement is also a step that can stand on its own as a significant phase of a staged remodel, and it makes a huge impact on the look of a kitchen at a reasonable cost.

Flooring Schedule

Whether it’s hardwood or tile, kitchen flooring replacement is relatively painless and can stand alone as a significant phase of a staged remodel. In most custom kitchen remodels, flooring is installed after cabinet installation. You will want to consider this carefully, study the difficulty of your existing flooring demolition and confirm whether the existing floor abuts the existing base cabinets or the existing cabinets are set atop the flooring.

If the flooring abuts the cabinets, it makes replacing the flooring without replacing cabinets easier, but demolishing a tough-to-remove existing floor, like tile set on a concrete slab, can be difficult without causing some damage to the finish of existing cabinets.

Take-away: Plan to install flooring after cabinets, but consider protection of cabinets and pre-existing circumstances carefully.

Finish Work Schedule

In some simple kitchen remodels, the finish work may be most of the job and can be broken into stages itself.

Plumbing fixtures, light fixtures, cabinet hardware, finish trim and finish painting are all facets of finish work. Once you have finalized (or revised) your kitchen layout, changing fixtures is an easy task for any decent tradesperson and can be completed in whatever order suits you.

Trim carpentry work usually should be completed before final paint, but if you’re planning on finishing the trim at a later stage, you might bring in the painter to complete all other aspects of the job first. Once you get to the point where only finish work remains on your job, the stages become easier to handle and the likelihood of error is greatly reduced.

Errors discovered at this point are usually from poor planning earlier in the process. Did your cabinetmaker have the correct appliance models and plumbing fixtures to construct his or her cabinets around? If you gave your cabinetmaker an appliance list, you can’t change selections without confirming that the new appliances precisely fit the plan.
https://goo.gl/K8ErzX

Thanks So Much,

ERA Skyline Real Estate
3376 Harrison Blvd.
Ogden, UT 84403

(801) 627-6500

Tuesday, December 13, 2016

Staging Your Home For The Holidays



Hello Friends,


Now that you’ve purchased a newly built home, it’s time to sell your old one. Sounds easy, right?
In this buyer’s market, it may not be as simple as placing a “For Sale” sign in your front yard. You have to woo home shoppers into loving your old home as much as you do. Staging is one way to find a buyer – and a way to possibly get more than you anticipated selling your home for, says John Lazenby, president of the Orlando Regional Realtor Association.
“According to the National Association of Realtors 2015 Profile of Home Staging, the majority of Realtors who responded to the survey believe that buyers most often offer a 1 percent to 5 percent increase on the value of a staged home,” he says. “A smaller group of Realtors believe the increase is closer to 6 percent to 10 percent.”
If you plan to stage your home, consider the time of the year. You don’t have to be a Grinch and get rid of all of your holiday décor, but you do need to be cognizant of just how jolly your home will be. Lazenby offered a few tips on how to stage your home for the holidays:
NHS: How do you stage a home with holiday décor with going over the top?
Lazenby: The keys to staging a home with holiday décor are restraint and elegance. Like holiday party jewelry, it’s important to limit the number of pieces to avoid over doing it. In addition, staging with simple decorations that complement the home’s architectural style (think shiny for modern or natural for Tudor) enhance the home rather than overwhelm it.
NHS: What are some “neutral” décor and colors to use in your holiday staging?
Lazenby: Neutral, tasteful decorations do not fall into “childlike,” “cartoonish,” “highly religious” or “highly personal” categories. Something unobtrusive, such as an evergreen garland or a string of white lights in an unexpected location, acknowledges the season without distracting buyers.
NHS: Seasons come and go – why should you stage your home for the holidays?
Lazenby: It is important to acknowledge the season with decorations to add warmth and interest to the house and to excite potential buyers with examples of how they could garnish the home if it were their own.
NHS: Do you need to spend lots of money to do so?
Lazenby: Sometimes the best decorations are free! Head to a tree lot and ask for an armful of the extra lower branches that have been shaved off, then place them in glass vases or hang them over the edges of cabinetry. If you’re lucky enough to live in a wintery location, incorporate winter berries or seed pods from ornamental grasses.
NHS: When should sellers not stage for the holidays?
Lazenby: Sellers should not stage their homes for the holidays if they are not going to be available to take the decorations down in a timely manner. A home still decked out in its holiday finery weeks after the new year passes is not appealing to buyers. 
Thanks so much,

ERA Skyline Real Estate
3376 Harrison Blvd.,
Ogden, Utah 84403

(801) 627-6500

Wednesday, December 7, 2016

5 Snow Filled Activities For Adults

Hello Friends,
With snow in the immediate forecast, parents all over the state are likely (if they haven’t already) digging out the winter gear, complete with mismatched gloves and stretched-out beanies, so that their kids can go outside and enjoy the fluffy, white magic stuff that falls from the sky.
While many parents and adults are content letting children have all the snowy fun, there are those who are just as enchanted by the winter weather. Some even take the snow play to a whole new level. Here are five snow-filled activities that even adults can enjoy.
Sledding
Sledding is a favorite pastime for many children, including Kelli Hansen’s six little ones. And while she does take her crew for fun-filled trips down the hillside, she reserves early mornings for her own mom-time adventures.
With toboggan in hand, Hansen goes up Neffs canyon on the north side of Mount Olympus. She said it takes an hour to get up, but the 15-20 minute ride down is pure joy.
 “It's really just my therapy,” she said. “I couldn't survive raising these six kids without a little mommy time. It's the perfect mix of exercise, enjoyment of the outdoors and God's creations — and it’s fun! The higher you hike, the longer you get to sled!”
Building a snowman
Mother of three and grandmother of 13, Holly Brown, was born to love the wintertime. With a December birthday, and a name like Holly, it was inevitable that each year when the snow began to fall, she couldn’t help but play in it.
This was the case during a recent snow storm, when she just had to go out on her balcony to build a snowman.
“We were staying in a condo over the weekend, and I just couldn’t help myself,” Brown said. “I didn’t have much to decorate with, but I did have some pretzels that I used for the hair, broccoli for eyes, Ritz Crackers for ears, cherry tomatoes for buttons, lemonade cans for arms, and of course, a baby carrot for his nose. Sometimes you just gotta.”



Backcountry skiing
When he’s not out tracking mountain lions or mountain goats, professional outdoorsman Matt Galland of Orem said he prefers backcountry skiing.
“Utah truly does have the greatest snow on earth,” he said. “Our dry environment makes for some low water content snow, causing it to be light and fluffy. Utah's Wasatch Front has endless backcountry ski options. In Utah county especially, you can ski 10,000 vertical feet a day without seeing a single person.
"Skiing by far is my favorite winter sport because it lets you go places you could never get to in a pair of shoes, snowshoes or even a snowmobile. It's fast on the way up and even faster down.
Galland advised backcountry skiers to take caution though and to be prepared before heading into the hills. “Be careful though. Avalanche conditions and steep terrain require a beacon, shovel, probe, and always a buddy for safety. Utah avalanche center has a ton of useful information and an app to keep you safer on the mountain. Until you have skied the face of Timp in 3-feet of powder, you haven't truly soaked in the best that Utah can offer in the winter.”
Fishing
For some, fishing is a sport for the warmer months, but for fisherman and KSL.com contributor, Spencer Durrant, there’s nothing quite like tossing lines out when there’s snow on the ground.
"Fishing in the winter is about being alone, about seeing the fresh snow and being the first one to step through it on your way to the river,” Durrant said. “It's about that serene beauty and lack of awareness of the world, of its problems, of life's general scariness, that almost makes you feel like a kid again. All you can do at that point is to continue to go fishing until someone else shows up on the river. ...
"In all reality, though, fly fishing in the winter is more relaxing than any other time of the year, except mid-June when the Pale Morning Duns hatch. Bundled up in layers, casting light line to spooky trout in crystal-clear water, and having the river mostly to yourself is the epitome of serenity. And as angler who fishes to gain a tighter grip on my sanity, that's more than I could ever ask of this sport."
Running
Playing in the snow in its most simplest form requires little more than a pair of running shoes — and an ugly sweater. At least that’s what over 100 adults found to be the case on Dec. 3, when they ran the first annual Ugly Sweater Run hosted by Park City Running Company.
People who dare call themselves adults from all over the Wasatch Front, including mother of five, Sara Malohifo’ou, headed out to run over 6 miles, including 1,300 feet of elevation gain through the winding mountain bike trails in Park City while wearing ugly holiday sweaters.
“It was a fabulous morning with amazing friends,” Malohifo’ou said. “Just a bunch of goofballs running through the mountain trails of Park City in ugly Christmas sweaters.”
The next time you find yourself sending the kids out to play in the snow, you might want to take your cue from these five fine examples of how to do "adulting" correctly, and get outside, too.  https://goo.gl/D0dJgm
Thanks so much,
ERA Skyline Real Estate
3376 Harrison Blvd.,
Ogden, Utah 84403
(801) 627-6500